- Home
- TECH Team Solutions for ministries
- Facility Solutions for ministries
- Facility Portfolio
Explore some examples of our many solutions below.
We provide innovative solutions for your ministry facilities; everything from Project Analysis Services to final Construction Documents, along with many other supporting services to make your ministry facility effective and efficient.
Total remodel
Project description:
Built in the 1960s, the building of Longview Christian Church was flooded due to a burst pipe during an unusually long winter freeze. During clean up the church discovered that asbestos was present in much of the building and needed abatement, which required extensive demolition.
The church approached TECH to provide renovation plans for their outdated 1960’s, flood damaged building into a space that meets their current needs. Part of that challenge was to transform the space in a way that brought the whole congregation together in the vision. TECH’s goal was to weave the bits of inspiration and vision the church provided into a cohesive, buildable design that brought together their desire for an open, modern space that had natural lighting, while honoring the history of the space.
Solutions Provided:
Preliminary Planning, Construction Documents (Architectural, MEP, and Structural)
New front
Foyer reception and coffee area
Foyer reception and gathering area
Reception looking towards gathering area
Gathering area
Gathering area looking towards reception
Entry to Worship area from front door
New Worship center 2
New stage close-up
New back Worship center 2
Hallway 2
Hallway looking towards foyer
Classroom 2
Classroom 3
Nursery 1
Nursery 2
Youth room
Youth room 2
Exterior Facade Remodel
Project description:
Started in 2007 in a bowling alley, the church moved into a facility that was in need of exterior upgrades. TECH Team designed improvements to the building’s exterior facade, including a covered porch that will allow for more gathering space for the congregation and will be a more inviting entrance to the facility.
Solutions Provided:
Master planning, exterior remodel, structural consultation, 3D Rendering
Original Church before construction
Elevations, front
Roof pitch, side of building
Rendering, front of building
Construction, front of building
Construction, front of building detail
Construction, hand rail detail
Construction, ramp detail
Construction, porch detail
Construction, side of building
Construction, Window detail
Exterior Facade Remodel
Project description:
Bread For Life International is an indigenous evangelistic, relief and development organization that seeks to address the issues of spiritual and physical hunger across West-Central Africa. The vision of the Tombel Ministry Center is to provide housing for short term guests and volunteers, office space for Bread for Life staff, and meeting space for smaller groups.
Solutions Provided:
Master planning, 3D Rendering
Tomble Ministry Center site plan
Preliminary Ministry Center
Elevations
Tombel Ministry Center rendering
Front gate rendering
Pool rendering
Main building rendering
New High School
Project description:
HEED Uganda is a holistic ministry to the people of Uganda. The ministry has established a K-12 school near Kyakitanga, Uganda. When they contacted TECH, the high school was meeting in a small wooden hutt. TECH provided design for a new high school facility that was to be the cornerstone of a multiphase master plan. When not in use by the students, HEED Uganda utilizes the space for medical clinics and other outreach opportunities in the community.
Solutions Provided:
Facility planning and design, 3D Rendering
Original High School
Rendering Lunchroom
Rendering Lunchroom
Finished High School
Finished High School lab
Finished classroom
Finished classroom
Students in finished computer lab
Gym and Education Center
Project description:
Since 1948 Camp IdRaHaJe (I’d Rather Have Jesus) has affected lives through summer camps, retreats, and outdoor activities. TECH was contacted to design a multipurpose gymnasium, meeting, and recreation space. One challenge we were presented with was incorporating a climbing wall that had been acquired from another organization that had ceased operations.
Solutions Provided:
Preliminary Planning, Construction Documents (Architectural, MEP, and Structural), 3D Rendering
Floor plan
Gymnasium rendering
Rendering of gym set up for a meeting
Under construction
Finished building
Inside finished gym
Gym set up for meeting
Lounging area
Canteen
Climbing rock
Project description:
When Mission Aviation Fellowship sought to relocate their international headquarters from Redlands, California to Nampa, Idaho, TECH was consulted to provide campus master planning for the relocation site. Due to an accelerated construction schedule, MAF contracted with a local design build firm to implement the master plan design. TECH maintained involvement as an owner’s representative to guide the design process and ensure the missions vision in the new facility was maintained.
Solutions Provided:
Master Planning, Facility planning and design, some preliminary construction documents.
Site Plan
Headquarters floor plan
Arial Main Headquarters and Aviation building looking SW
Arial Main Headquarters and Aviation building looking E
Close up Front Entrance
Main Headquarters viewed from RV Park
Front Main Headquarters
Front from the right
Handicap entrance
Main meeting room
Sound baffling for main meeting room
Side entrance (Aviation building behind on right)
Headquarters with Aviation behind
Aviation Building
Aviation Building
Campus Master Plan and Facility Design
Project description:
Beginning in the early 2000’s TECH collaborated with International Community School of Ghana, West Africa, across two decades to provide planning assistance. During that time TECH provided Campus Master Planning for two sites, one in Kumasi and the other in Accra. The majority of the planning focused on the Kumasi campus with the design of multiple prototypical designs for classrooms and dormitory facilities. Additional plans were provided for specific functions such as library, dining, offices, and athletic facilities. On a volunteer basis, construction consultation and assistance were provided by retired contractors visiting the site.
Solutions Provided:
Master Planning, Facility planning and design, construction assistance (by volunteer).
Site Plan
Housing cluster plan
5 housing plan
Housing cluster floor plan
Construction, front of building
Entry gate and sign
TECH architect Bob Schill providing construction oversight
Examining finished construction drawings by TECH
Bus round with Admin building under construction
Finished bus round with admin building
Bus round looking toward entry gate
Housing/dorms
Housing/dorms detail bedrooms
Housing/dorms bathroom detail
Housing/dorms (old one on right, not torn down yet)
Housing/Dorms
Interior of school commons detail
Interior of school commons detail
Sports complex almost finished
In school pool with sports complex building
Weight room in sports complex building detail
Weight room in sports complex building detail
In school pool with bleachers
In school pool bleachers detail
Check for Eligibility
We have established a policy of only providing our services and products to like-minded organizations. Please see our Eligibility section to begin this process.
YOUR MISSION IS OUR MISSION
We have the solutions you can afford!
Join Us &
Make a Global Impact
Get INvolved: help make an impact on the world. TECH Team’s focus is on helping Missions and Churches spread the word of Jesus Christ throughout the world. Joins us on our mission.